Taipei, Feb. 10 (CNA) The Hsinchu County-based Industrial Technology Research Institute (ITRI) on Tuesday broke ground on its Advanced Semiconductor R&D Base, a NT$3.772 billion (US$119.57 million) publicly funded project slated for completion in December 2027, with phased operations beginning in the first quarter of 2028.
Speaking at the groundbreaking ceremony, Premier Cho Jung-tai (卓榮泰) said Taiwan Semiconductor Manufacturing Co. (TSMC) has actively supported the establishment of the R&D base, including donating three 12-inch advanced-process semiconductor development tools and providing extensive assistance and guidance on plant design and construction.

In addition to Cho, the ceremony was attended by Minister of Economic Affairs Kung Ming-hsin (龔明鑫) and National Science and Technology Council Minister Wu Cheng-wen (吳誠文).
Representatives from major semiconductor firms, including TSMC, United Microelectronics Corp., Vanguard International Semiconductor Corp., Powerchip Semiconductor Manufacturing Corp., Nanya Technology Corp. and Advanced Semiconductor Engineering Inc., were also present, along with several equipment suppliers.
Once completed, the facility will carry out three key missions -- innovation trial production and verification for integrated circuit (IC) design, development of advanced semiconductor manufacturing processes, and localized verification of semiconductor equipment and materials--said Kuo Chao-chung (郭肇中), director-general of the Department of Industrial Technology under the Ministry of Economic Affairs.
Kuo said the new facility is expected to help semiconductor companies shorten product development timelines by around 30 percent, strengthening Taiwan's semiconductor innovation ecosystem and supply chain resilience.
According to Kuo, the project underwent two years of planning and will feature a building with an eight-meter ceiling height, a floor load capacity of two metric tons per square meter, and an independent seismic-resistant structure.
Construction of the building itself will cost NT$688 million, while cleanroom facilities will account for NT$3.084 billion, bringing total investment to NT$3.772 billion, Kuo said.
The base will house pilot production lines for advanced semiconductor processes, submicron sensing chips and advanced packaging, as well as laboratories for inspection, measurement and verification, he added.
-
Politics
President calls for immediate release of Jimmy Lai
02/10/2026 06:26 PM -
Society
Translation devices, mascots cost students in university entrance exam
02/10/2026 05:29 PM -
Society
3,400 kg of Indonesian snacks fail checks over sweeteners, aflatoxins
02/10/2026 05:02 PM -
Business
ITRI breaks ground on NT$3.77 billion advanced chip R&D base
02/10/2026 04:48 PM -
Business
U.S. dollar closed lower on Taipei forex market
02/10/2026 04:29 PM